Office Development

I'm a title. ​Click here to edit me.

The Wharf

The Wharf

Phase 2 of The Wharf will feature an additional over 1.15 million square feet of mixed-use development, including office, residential, marina, and retail space, as well as parks and public spaces, across nearly one-half mile of waterfront in Southwest Washington, DC. MLG team members provide senior-level construction management services for Hoffman & Associates and Madison Marquette during the construction phase of this project.

District-headquartered Perkins Eastman DC, the master planner and master architect of The Wharf, continues to guide the design for Phase 2, channeling the collective vision to ensure that The Wharf is a beloved waterfront neighborhood for generations to come.

The architects and designers comprise one of the most impressive lineups in the nation, including SHoP Architects, WDG, ODA, Rafael Vinoly, Morris Adjmi Architects, Hollwich Kushner, S9 Architects, Michael Van Valkenburgh Associates, and Wolf Josey.

Phase 2 at a glance includes 255 apartments, 96 condominiums, 131 hotel rooms, 223 boat slips at the Wharf Marina, 1.5-acre park at the Marshall Park Landing, 547,000 square feet of office space, 95,000 square feet of retail space, and 2 parking garages with over 1,000 spaces total.

The Gathering Spot

The Gathering Spot

The Gathering Spot DC is an exclusive club serving entrepreneurs in Washington DC. This interior renovation consists of transforming three levels of office space into an event hall, restaurant and bar, and co-working office spaces for its members. MLG team members represented the ownership to strategically coordinate the client’s design team, vendors, and general contractor as well as navigated the team through the city’s inspections and business licensing processes to achieve occupancy for the club.

Pike & Rose – Canopy by Hilton

Pike & Rose – Canopy by Hilton

Pike & Rose is an iconic 24-acre mixed-use development along Rockville Pike just north of the White Flint Metro. Phase 2 of this development brought Pike & Rose Block 7 which was a mixed-use of density including 35,000 SF of ground level retail as well as a nine-story, 177-key hotel with 100-unit luxury condominium residences above. Hilton selected the hotel to launch Canopy by Hilton, their new boutique brand. MLG team members worked as construction management project leads while at a previous firm in overseeing all aspects of construction on behalf of the Owner.

US Embassies and Consulates

US Embassies and Consulates

The U.S. Department of State provides safe, functional, sustainable, and reliable facilities for work, living, and auxiliary functions in support of diplomatic missions around the globe; constructed, operated, maintained, and repaired by the Bureau of Overseas Buildings Operations. The Office of Facilities Management, Small Projects and Transition Division supports posts both from Washington D.C. and onsite with construction management of repair and improvement projects, as well as supports the transition from construction to facilities management of New Embassy (and Consulate) Compounds by managing construction, ensuring turnover of material and maintenance library documentation, assisting with maintenance staff hiring, ensuring training, and monitoring purchasing of maintenance tools and equipment. MLG team members have served as construction managers and transition coordinators while at a previous firm for multiple projects worldwide.

National Archives

National Archives

The National Archives historical renovation in Washington DC was a complex renovation where all the major building systems were upgraded. Additionally, a new 290- seat theater was installed as well as renovations to exterior façade, new museum exhibit space, rotunda, and vertical transportation. One of the primary challenges in this project was to preserve the historical integrity of the building that was originally constructed in 1934. MLG team members served as onsite construction personnel while at a previous firm, on behalf of the general contractor during these improvements.

United States Department of Agriculture

United States Department of Agriculture

The U.S. Department of Agriculture South Administration Building is listed on the National Register of Historic Places. This project consisted of hazardous materials abatement, selective demolition and the renovation of office space, escalators, elevators, lobbies, judge’s chambers, and MEP improvements. MLG team members served as onsite construction personnel while at a previous firm, on behalf of the general contractor during these improvements.

Solaris Paper

Solaris Paper

The 1M square foot warehouse / industrial building was delivered to the Solaris Paper Company as part of a 20-year ground lease. The warehouse is located right off Interstate 81 in Winchester, Virginia. Additional to the warehouse space, roughly 25,000 square feet of office space was delivered to operate out of the facility. This industrial property features; parking, large bay areas for delivers, and office space for operations. MLG team members worked as Owner’s construction management staff to deliver these improvements towards a successful completion.

Tradepoint Atlantic

Tradepoint Atlantic

Tradepoint Atlantic has proposed several civil and infrastructural improvements at their 3,500-acre facility in Sparrows Point, MD. Sparrows Point is home to some high-profile tenants including distribution centers for FedEx, Amazon and Under Armor, grain storage for Perdue Agribusiness and a vehicle-shipping operation run by Pasha Automotive. Tradepoint Atlantic has embarked on a mission for a modern industrial revival that will transform this former steel mill into one of the largest and most strategically significant intermodal global logistics hubs in the country. MLG team members have served as third-party senior construction management oversight for several civil and infrastructural improvements throughout this property.

Whittle School & Studios

Whittle School & Studios

Whittle School & Studios is a state-of-the-art charter school with a mission to provide unique, modern and truly global institution serving children from ages 3 to 18. This project is located at the former Intelsat headquarters Northwest, Washington DC and consists of the renovation and adaptive re-use of the existing 831,000 GSF office building into a private charter school facility containing 250 classrooms that will serve up to 2,500 students. MLG team members served as senior construction oversight during the construction of this unique project.

Stratford University

Stratford University

This project consisted of Interior and exterior construction and renovation of an existing five-story office building to house Stratford University’s new Alexandria campus. The project consisted of administrative offices, lecture and health sciences classrooms, lecture halls as well as coordination to extend new gas service main through an existing office park to accommodate Stratford University’s culinary program. MLG team members worked as construction management project leads while at a previous firm in overseeing all aspects of construction on behalf of the Owner.

SAP NS2 - National Security Services

SAP NS2 - National Security Services

The SAP NS2 | National Security Services is a wholly owned subsidiary of SAP providing leading analytics insight and data fusion technologies and apply them to mission critical workloads. Their office renovations in Herndon, VA consisted of a 13,000 SF multi-phased interior build-out and office space expansion. This project consisted of new tenant build-out improvements as well as expansion of existing secure office space. All construction was coordinated in phases to accommodate uninterrupted secure operations of SAP NS2. MLG team members worked as construction management project leads while at a previous firm in overseeing all aspects of construction on behalf of the Owner.

2800/2900 Crystal Drive (Potomac Gateway)

2800/2900 Crystal Drive (Potomac Gateway)

Potomac Gateway is a 344,000 SF, two building office complex, located in the vibrant Crystal City area of Arlington. This project featured; newly renovated and modern lobbies and common corridors with upgraded and improved flooring, fixtures and wall coverings, renovated restrooms, elevators, and structural repairs to the 400 space below grade parking garage. Roughly 200,000 square feet of mixed tenant spaces (including GSA spaces) were built-out on this project as well between the two buildings on the complex. MLG team members worked as Owner’s construction management staff to deliver these improvements towards a successful completion.